Concrete

Features of SP wall pile (steel embed PHC pile)

It is a construction method that can replace the existing retaining wall construction such as earth plate, CIP, SCW, and slurry wall, and the PHC pile with embedded steel plate is used as the retaining wall, thereby eliminating the on-site concrete pouring process and reducing on-site safety and environmental pollution, which is excellent in cost reduction, construction period shortening and quality.

특허 및 기술 인증

[Patent and Technology Certification]

Patent certification for SP wall pile construction method for temporary retaining

Patent Registration No. 10-1901091

Technology certification for 「Design and Construction of Temporary Retaining Walls using SP Wall Pile (steel embed PHC pile) Construction Method」 by Korea Association of Professional Engineers In Geotechnical  

KAPE No. 22-001

※ Design support and construction consulting

Features of SP PILE construction

3rd generation retaining wall pile using PHC pile manufactured in factory by embedding steel plate for bracket installation

The stability is secured as the PHC pile integrated with the steel plate bears the load of the wale and strut.

Economical construction method that does not require H-beams, reinforcing bars and ready-mixed concrete at the construction site