본문 바로가기


Company News

Development of the latest PC method ‘I.D.W Double Wall’

IS Dongseo Concrete Business Division developed the latest PC (precast concrete) construction method, ‘Isdongseo Shear Double Wall (I.D.W) construction method’.
IS Dongseo Double Wall uses a mixture of shear reinforcing bars and reinforcing materials for connecting materials that connect panels (walls) to enhance durability and reduce the cross-section thickness by 100mm compared to other companies.
As the thickness is reduced, the volume of filling concrete is reduced by 12%, and the speed of pouring pressure is more than doubled, which can reduce costs by more than 200,000 won per 1-lube and improve productivity.